The problem was apparently due to the huge dumpster's rear door not being closed properly. Any attempt to haul the dumpster away would have resulted in its contents falling out the back. It was corrected the hard way, by hand-removing tons of debris enough to lock the door in place.
It was then hauled away and the dumpster quickly started to grow again.
Meanwhile, the drywall crew finished their work, followed by the texturing and painting crew, the trim crew, and even the garage attic stairs installer.
There's still more to do to finish up the trim, but things are moving right along.
There's no official estimate on when we can actually move in but some of the neighbors are saying we could be ready to move in by early December. That would be great, but we don't want to rush any important steps, possibly causing one step to be done poorly or missed entirely. And All of them are important enough to be done right. Fortunately, our builder thinks the same way.
Bricking starts next week.